ACUPCC Reporting System

Implementation Profile for Wake Technical Community College

Submitted on July 6, 2010; last updated on July 6, 2010

Institution Information

Basic Carnegie Classification Assoc/Pub-S-MC: Associate's Public Suburban-serving Multicampus
Control Public
Location Raleigh, NC
Community Setting Urban fringe of mid-size city
USDOE Climate Zone 4
Current President or Chancellor's Name Stephen Scott
Current President or Chancellor's Title President
Main Web Site http://www.waketech.edu/
Sustainability Web Site http://leed.waketech.edu/index.php

Implementation Structure

Implementation Liaison's Name Wendell Goodwin
Implementation Liaison's Title Facility Enginnering Officer
Implementation Liaison's Department Facility Engineering
Format of Structure Committee
Number of Individuals in Structure 10
Stakeholder Groups Represented Board, Faculty, Students, Executive, Staff
Description In addition to bringing on Moseley Architects to assist in the development of the GHGI, WTCC Facility Engineering Officer, Wendell Goodwin selected members from Facilities Management, Institutional Effectiveness, Business Office, Academics and Curriculum Education Services to be part of the group. Many of the members, including President Scott had been part of previous sutainabilty committees and instrumental in the sustainable practices already established on the campuses.The committee intended to introduce stuents into the group once the initial inventory is complete in summer 2010.

Tangible Actions

1. Establish a policy that all new campus construction will be built to at least the U.S. Green Building Council's LEED Silver standard or equivalent.

Yes: LEED for New Construction Policy
All new construction and major renovation projects of 5,000 gross square feet or greater commencing design after January 1, 2010 shall be designed, constructed, and certified at the silver level in accordance with the current version of the LEED for New Construction Green Building Rating System, as published by the US Green Building Council.

LEED for New Construction Procedures
I. Project Development
1. During the preplanning study, determine which LEED criteria are appropriate to address during the design and construction of the project and capture that information on a preliminary LEED scorecard. Identify any issues that need resolution prior to the procurement of professional services.

II. Procurement of Professional Services
1. In all solicitations for Architect/Engineer (A/E) services, the LEED Silver certification objective will be clearly stated.
2. Selection criteria for A/E services will include demonstrated experience with high performance building design and the successful completion of the LEED certification process.

III. Design Reviews and Approvals
1. At each phase review, an updated LEED Scorecard will be submitted to Facilities Management by the A/E firm.

IV. Construction Bids
1. Construction specifications will include, within the General Conditions, a LEED requirements section that clearly defines the General Contractor’s responsibilities, as related to LEED documentation.
2. Construction specifications will include, within applicable technical sections, LEED related requirements and submittals.
3. Provisions for retaining payment to General Contractor shall be indicated in the project specifications to ensure proper construction documentation and completion of the LEED certification process.

V. Project Monitoring
1. Appropriate Facilities Management personnel will be granted access to LEED Online, to allow for participation in and monitoring of the LEED certification process.
2. All construction progress meetings shall include updates and discussion on LEED documentation.

2. Adopt an energy-efficient appliance purchasing policy requiring purchase of ENERGY STAR certified products in all areas for which such ratings exist.

Yes: Equipment Purchasing Procedure
Equipment Purchasing Procedure Equipment is defined as nonexpendable items placed on the inventory of the College. Generally, equipment is not consumed, exhausted, or changed in shape with use and will normally last more than two (2) years. Equipment is categorized as major or minor, depending on cost.
Equipment requests should originate at the department level. Each piece of equipment must be requested on a separate Expenditure Authorization Request. Complete description, justification, and vendor information are required along with cost and other data. The Business Services Office in Holding Hall has vendor catalogs available for reference. A list of all current state contracts is available on the Internet and should be referred to in preparing equipment requests. Information on computer equipment should be obtained from Information Technology Services where applicable.
All employees with purchasing responsibility or who are involved in procurement decisions for energy-consuming products are expected to seek out an Energy Star® labeled model of the product under consideration. A list of qualifying items can be found on the Energy Star website (www.energystar.gov)
This procedure is not intended to circumvent the use of state contracts. When purchasing equipment using state contracts, the college will make a reasonable attempt to identify and purchase Energy Star equipment while continuing to abide by state procurement policy.
For purchases of over $5,000, please contact the Business Manager prior to submitting a request (Expenditure Authorization Request) to avoid delays in processing due to insufficient information.
E05a.102_Equipment Purchasing Procedure_4-Business

Equipment Purchases
Equipment purchases are subject to all College and state procurement guidelines.
All employees with purchasing responsibility or who are involved in procurement decisions for energy-consuming products are expected to seek out an Energy Star® labeled model of the product under consideration. A list of qualifying items can be found on the Energy Star website (www.energystar.gov)
This procedure is not intended to circumvent the use of state contracts. When purchasing equipment using state contracts, the college will make a reasonable attempt to identify and purchase Energy Star equipment while continuing to abide by state procurement policy.
When purchasing equipment the end user must coordinate the request with facility services to ensure the proper utilities are in place for the equipment. This may include gas, electricity, water, etc.
Facilities Services will determine if such service now exists or if it is to be installed, the lead time required, and any other procedures that need to be followed. The department making the procurement request should ask that a cost estimate be added to the request to reflect the additional service costs.

3. Establish a policy of offsetting all greenhouse gas emissions generated by air travel paid for by our institution.

No: No information provided.

4. Encourage use of and provide access to public transportation for all faculty, staff, students and visitors at our institution.

No: No information provided.

5. Within one year of signing this document, begin purchasing or producing at least 15% of our institution's electricity consumption from renewable sources.

No: No information provided.

6. Establish a policy or a committee that supports climate and sustainability shareholder proposals at companies where our institution's endowment is invested.

No: No information provided.

7. Participate in the Waste Minimization component of the national RecycleMania competition, and adopt 3 or more associated measures to reduce waste.

No: No information provided.